Robinson R44 Astro with major scheduled maintenance completed in June 2026. The aircraft presents an attractive maintenance status with numerous major airframe and component intervals reset at 4,135:12 hours.
Aircraft
These basic aircraft data are directly stated in the maintenance status.
A major maintenance event was recorded on 22 June 2026 at 4,135:12 hours.
The next RHC 2,200-hour inspection is shown due at:
6,335:12 hours — 2,200 hours remaining
The next 12-year inspection is shown due on:
22 June 2038
This is one of the aircraft's strongest selling points: many of the major R44 components and maintenance items are consequently shown with 2,200 hours remaining and/or calendar limits extending to June 2038.
Main Rotor Blades
The maintenance schedule separately shows the C016-7 blade/C158-1 spindle assembly 12-year maintenance due 01 October 2027. This should not be hidden in a sales advertisement, because a knowledgeable R44 buyer will notice it during pre-buy review.
I would therefore state this separately in the detailed specification rather than advertising simply "2,200 hours remaining on everything."
Tail Rotor Blades
The maintenance status shows several important components with the new 2,200-hour interval to 6,335:12 FH, including the main gearbox gear set, main rotor hub, main rotor spindle, main gearbox sump and main gearbox housing.
The Main Rotor Gearbox Assembly, S/N 13319, is shown with its next 12-year service due 22 June 2038 and its 2,200-hour TBO position due at 6,335:12 FH.
This supports a strong but accurate sales phrase such as:
Major drivetrain components with up to 2,200 hours remaining following the 2026 maintenance event.
Lycoming O-540-F1B5
The document also schedules the inspections applicable to a new/rebuilt/overhauled engine, beginning with the first 10-hour and 25-hour inspections.
For an advertisement I would therefore write:
Lycoming O-540-F1B5 – maintenance/overhaul cycle commenced June 2026 at aircraft TT 4,135:12; up to 2,200 FH shown remaining in the current maintenance status.
I would not write “brand-new engine” unless the engine logbook or release documentation specifically proves that.
Both magnetos are recorded with the June 2026 maintenance cycle:
The overhaul/replacement schedule records 2,200 FH remaining / calendar to June 2038.
The carburetor and starter are likewise shown with the corresponding engine overhaul interval. The starter is recorded with a date of 16 July 2026.
One exception is important: the alternator does not have 2,200 hours remaining. The document records only 898:06 FH remaining for the alternator.
That is another reason I would avoid a blanket claim such as “all components zero time.”
The following inspections were performed/reset on 22 June 2026:
Their next due date is shown as 22 June 2028 ±30 days.
Weight & Balance was also performed on 22 June 2026, with the next interval shown for June 2030.
The ELT battery is shown with:
The halon-free fire extinguisher has a replacement limit of 31 December 2037
Are you interested in the Robinson R44 – OE-XXK OE-XXK and would like to get more information? Simply call us +49-177-7777345 / +49-2736-2995339 or use our Contact Form to leave us a message!